Asicorp S.A | Customers
16456
page-template-default,page,page-id-16456,vcwb,ajax_fade,page_not_loaded,,qode-theme-ver-16.0.1,qode-theme-bridge,disabled_footer_top,wpb-js-composer js-comp-ver-5.4.7,vc_responsive

Customers

works carried out from 2002 to date

2017

Zaldivar Mining Company

Study and evaluation of the problems of breakages and corrosion damage of the El Negrillar-Work adduction pipe

Minera Escondida Ltda.

Feasibility study for the implementation of cathodic protection in aqueduct that drives water from Coloso to the Mine.

 Minera Escondida Ltda.

Study of mitigation of the external corrosion of the aqueduct that drives water from Coloso to the Mine through the use of inhibitors

 Minera Escondida Ltda.

Development of bidding rules for the repair and maintenance of carbon steel silos containers of explosive chemical products in ENAEX plant

 Oxiquim S.A.

Fault inspection and assessment at TK 305 at the Quintero maritime terminal.

 ASICORP S.A.

Implementation process and certification in ISO 9001: 2015.

ASICORP S.A.

Start of the second phase of the R & D project for the validation and packaging of a joint device for carbon steel pipes that does not damage or burn the internal lining during the welding process, a project developed with the support of CORFO.

 Minera Escondida Ltda

Project manager for the inspection and quality assurance work for the anticorrosive maintenance project of the metallic structures and silos of the Enaex Plant in the Mine.

 Minera Escondida Ltda.

Fault analysis and study of the problem of ruptures by corrosion of the Coloso-Mina aqueduct. It includes the conceptual study of the solution mechanisms.

 2016

Minera Escondida Ltda.

Study of the quality of the internal coatings of the adduction pipes of the EWS project. Corresponds to the evaluation of the water absorption rate of these coatings.

ASICORP S.A.

Development of the first phase of the R & D project for the development of a welded joint capable of avoiding any damage to the internal lining of carbon steel pipes, a project developed with the support of CORFO.

Minera Escondida Ltda.

Study, evaluation of mitigation systems and solution designs to the corrosion problem of the aqueduct that drives water from Coloso to the Mine.

2015

ASICORP S.A.

Development of the first phase of the R & D project for the development of a welded joint capable of avoiding any damage to the internal lining of carbon steel pipes, a project developed with the support of CORFO

 Minera Escondida Ltda.

Study, evaluation of mitigation systems and solution designs to the corrosion problem of the aqueduct that drives water from Coloso to the Mine.

 Minera Escondida Ltda.

Study and evaluation of the problem of strong incrustation and mechanism of mitigation of these incrustations in the pipeline

 Minera Escondida Ltda.

Technical inspection of work and quality assurance to the repair and maintenance work of truck washing slabs.

 Minera Escondida Ltda. Elaboration of the bidding technical bases for the maintenance project of the truck washing slabs.

Minera Escondida Ltda.

Technical specifications for repair of concrete floors and metal structure of truck washing slabs.

2014

Minera Spence

Study of the degree and advance of corrosion of the EW Ship based on the analysis of anticorrosive demand. It included metal structure, bridge cranes, concrete floors and structures, FRP structures, pipes, coating plates, fastening systems and bolted joints and ventilation system. According to these results, the technical specifications for each sector and area of ​​the Ship were designed.

Minera Spence

Fault analysis and study of structural collapse by corrosion of the metallic structure of the tertiary harness and secondary crusher

Minera Spence

Technical specification of paint for new metal structure of the tertiary harness and secondary crusher. Inspection in factory to the application of the coating of these equipment.

Minera Spence

Technical specification of paint and maintenance procedure of the metal structure of the agglomerators.

Minera Escondida Ltda.

Continuatión contract finalized in November 2013 and extended until June 2014

Revestimientos Saceem Ltda.

Fault analysis of a duplex system applied to railings directly exposed to the marine environment.

 2013

Minera Escondida Ltda.

Contract for 18 months. Corresponds to the full diagnosis of the most critical situations regarding the degree of corrosion and condition of the coatings of the facilities in Puerto Coloso and Mina. As the corrosion problems transcend transversally to other disciplines, the contract considers the anticorrosion protection and engineering designs for the maintenance works, which allow to project the installations for 30 years

2012

Fluor Chile

Evaluation of protection schemes and technical specification of paints for metal structures and concrete coatings, Sierra Gorda Project.

Revestimientos Saceem Ltda.

Fault report to coating of inorganic paint rich in zinc, applied in Electrical Rooms built for Minera Escondida Limitada. The expertise was carried out in dependencies of the supplier company Rolec, Santiago.

 Attex Ltda.

Fault analysis of exterior coating of water pipes manufactured and painted in China for the Antucoya project

Barrick Peru

Inspection of the metallic structures painting  that will operate in four pools that will contain acid waters and cyanide waters for the Lagunas Norte project in Alto Chicama, Peru. These structures were manufactured in Lima by Maestranza Esmetal. The protection designs were also developed by Asicorp S.A.

2011

Codelco Chile

Study and development of paint specifications for the metallic structure of the engineering projects of the VCP

Outotec Chile Ltda.

Design of paint specifications and antacid coatings for metal structures in the wet area, Caserones project

Outotec Chile Ltda:

Study and design of the antacid coatings specifications for the concrete floors of the wet area, Caserones project

Outotec Chile Ltda.

Design and evaluation of the interior protective lining of thickener for Mina Hales project.

Fluor Chile

Evaluation of the infrastructure and operational capacity of painting of the Esmetal factory in Lima, Peru, Pila Nueva project with CIC.

ERCO Worldwide

Study and design of the condition of concrete floors and protective coatings for Mininco Plant.

ERCO Worldwide 

Study of the corrosion state and design of the protective coatings for structure and metallic elements in Mininco Plant

Anglo American

Study of the corrosion state and design of the protective coatings for structure and metallic elements of the El Soldado Division Building.

Suez Andean Projects:

Paint failure evaluation in water storage tanks at the Andina Thermoelectric Plant in Mejillones

GHD Engineers:

Advice to the designs of anticorrosive protection of piles and metal structure for the project “Repair Dársena, Molo Chacabuco and Molo Prat of the Asmar Talcahuano Plant, Repair of Molo 500 and Construction South Molo of the  Chileans Navy ”

Fluor Chile:

Evaluation of protection schemes and technical specification of paints for metal structures and coatings for concrete, NaHS Plant and Mineral PAG, Conga Project

Outotec Chile Ltda.

Design of paint specifications and antacid coatings for metal structures and concrete floors in the wet area, Caserones project (2011).

2010

Codelco Chile:

Study and development of the technical specifications of painting for the metallic structures of engineering projects of the VCP

Delkor Chile

Evaluation of coatings systems for thickeners of the Pascua Lama project

Fluor Chile

Study, evaluation and design of the anticorrosive systems of metallic structures and concrete foundations of the facilities of the ponds for the Pila Nueva Project with CIC in Alto Chicama, Peru (2010).

Minera Zaldivar S.A.

Evaluation, diagnosis and design of antacid systems for the repair of concrete floors and pillars cell supports of EW Building

 Hatch Ingenieros y Consultores Ltda:

Study, design and elaboration of the technical specifications of interior corrosion protection of ponds for chemical treatment plant belonging to Compañía Minera Doña Inés de Collahuasi.

Petrohué River Building, Viña del Mar:

Study and design of repair of blown stuccos that presented detachment, with high risk to people. The project report considered the total removal of the stucco, the repair of damaged concretes, waterproofing of the planters and balconies, placement of an adequate coating. The volume of stucco to be removed is 83 m3

2009

Fluor Chile:

Study and development of technical specification of paint for metal structures and exterior of ponds Pascua Lama of Barrick project.

Fluor Chile

Study and development of technical specification of paint for metallic structures of the Expansion New Andina project of Codelco Chile

Portland S.A.

Repair design, anticorrosive treatment and maintenance inspection of 2 caustic soda container tanks.

Copacabana Building, Viña del Mar

This building, built in 1963, presented problems of corrosion in the filling and filtering of rainwater in various sectors. The study considered exterior maintenance engineering for the entire building (2009).

Minera Escondida Ltda.

Corrosion study and design of technical solutions to protect metal structures, concrete, piping, equipment and elements for Filter Plant, Port and Desalination Plant in Puerto Coloso. The purpose of the study was to evaluate the situation and define the anticorrosive systems to project the Plant to 30 years.

2008

Hatch Ingenieros y Consultores Ltda.

Technical specification of interior and exterior coating of aqueduct for mining project in Cuba

 Hatch Ingenieros y Consultores Ltda.

Study of corrosion and designs of antacid protection systems for Nave EW of Minera Escondida Ltda.

Central Nehuenco

Study and design of repair paint systems for the damaged structures, subcontract of the DICTUC

Central Nehuenco:

Evaluation, analysis and definition of the state of the building paint and mapping of the maximum temperatures reached by the different sectors affected by the accident that took place in December 2007. Subcontract of the DICTUC

Minera Los Pelambres

Analysis and review of the start-up of the cathodic protection system of the aqueduct and sewer system for the Tranque Mauro Project .

 2007

Minera Los Pelambres

Counterpart to the design and calculation memory of the cathodic protection system of 50 km of buried pipes for the Tranque Mauro project.

Aguas de Antofagasta S.A.

Diagnosis and study of the degree of corrosion and state of the coating of the Carbon Steel Republic Pond, in TalTal

Aguas de Antofagasta S.A.

Diagnosis and study of the degree of corrosion and condition of the coatings of the two carbon steel tanks, drinking water containers of the Topater Plant in Calama. Design of the technical specifications of the protection coatings, design and calculation memory of the cathodic protection system inside the ponds. Preparation of technical bidding rules for maintenance project.

Aguas de Antofagasta S.A.

Diagnosis and study of the degree of corrosion and condition of the coatings of the three coagulators of the Topater Plant in Calama. Design of the technical specifications of the protective coatings, design and calculation memory of the cathodic protection system of the metallic elements inside the coagulators. Preparation of technical bidding rules for maintenance project.

 Mining Company Xstrata Lomas Bayas

Diagnosis and study of the degree of corrosion and condition of the coatings of the Tank Farm. Design technical solutions for anticorrosive protection of metal structures and preparation of technical bidding rules.

BHP Chile Inc.

Study and development of General Criteria Manual for Paints that will be used by Minera Escondida Limitada, Minera Spence and Minera Cerro Colorado

2006

Minera Los Pelambres:

Evaluation and analysis to failure of interior paint of adduction pipe (2006).

Molymet S.A.

Evaluation and analysis of corrosion failure of the stainless steel process pond. Preparation EETT of repair.

 Molymet S.A.

Evaluation and analysis of corrosion failure of Larox Filter. Preparation EETT of repair.

Port Works Directorate DOP

Talk to regional port directors in Anticorrosive Protection

San Antonio Quay Expansion Project, STI.

Permanent technical inspection of the anticorrosive protection systems of piles and structures. Dock Expansion Project, (Start August 2005, End December 2006).

Endesa, Central San Isidro

Technical Inspection and Evaluation of refrigeration system suction pipe linings.

 Minera Zaldivar Company

Project for Repair, Maintenance and Antacid Protection of Concrete Floors, Train B, Plant SX (2006).

San Antonio Quay Expansion Project, STI

Development of Technical Specification of Coatings for maintenance of Splash zone of driven piles (2006).

Minera Escondida Ltda.

Desalination Plant, Manual of Procedures for Maintenance of Coatings of Desalination Plant and Aqueduct.

2005

CMPC Celulosa Santa Fe

Training Course on Anticorrosive Protection (2005).

Aker Kvaerner

Advice: Evaluation and correction to application techniques of Anticorrosive Systems for SPENCE Project in Factory.

CAP, Talcahuano

Pond Corrosion Study containers of lubricant solution for cold rolling process.

San Antonio Quay Expansion Project, STI

Development Technical Report of Analysis and Detection of Failure of Port Defenses. Among the materials, Galvanized, Coatings, Elastomers

were considered.

SQM, Tocopilla Plant

Diagnosis, study and design of engineering and bidding rules for the maintenance work of the Mechanized Arm, Correa 2 and Silos.

Puerto Coloso, Minera Escondida

Study of the Puerto Coloso Pilot Maintenance Project for Proconsa Ingeniería S.A.

San Antonio Wharf Expansion Project, STI

Integral consultant of the ITO of the Expansion of the Dock Project, in charge of the anticorrosive protection systems of piles and structures (2005).

San Antonio Wharf Expansion Project, STI

Advice and technical specifications of anticorrosive methods and systems for repairing galvanized structures in the Port

Aker Kvaerner, Spence Project

Permanent technical assistance to the anticorrosive protection systems of the metallic structures of the project

San Antonio Wharf Expansion Project, STI

Study, Consultancy and Preparation of the Coating Technical Specifications of   Maintenance work of the Piles of the Dock

2004

San Antonio Wharf Expansion Project, STI

Elaboration of the Technical Specifications of Paints for Proconsa Ingeniería, a company that developed the engineering for the Dock Expansion Project .

 Puerto Abastible, VIII Region

Elaboration of the Technical Specifications of Paints for Proconsa Engineering, a company that developed the engineering for the Dock Construction Project

Spence Project

Consulting and Review Technical Specifications for Aker Kvaerner (2004).

Oxiquim S.A.

Counseling and Inspection of painting work Coronel Project Plant

Minera El Tesoro

Inspection of interior and exterior painting of replacement pipes for the aqueduct, in Alvenius Chilena Ltda. Plant.

Minera El Tesoro

Study Technical Specifications for different alternatives and technologies of interior and exterior coatings adduction pipe.

Sigdo Koppers, Oxygen Plant # 3 of Codelco Chile El Teniente Division

Advice and Inspection to the work of Anticorrosive Protection of the Plant

2003

 Oxiquim S.A.

Elaboration of Paint Specifications, Coronel Project Plant

Minera El Tesoro

Corrosion failure assessment Adduction pipe (2003).

Port Cape Froward

Diagnosis of the state of corrosion and condition of the paints, metal structures, annex elements and piles of the Pier.

Codelco Chile Salvador Division

Counterpart to the details engineering for the repair and recovery of the underground floor of the Potrerillos Refinery.

Minera Punta de Lobos Society

Study and Development of the Technical Specifications of Pier Paintings.

SQM, Tocopilla Plant

Diagnosis of the corrosion of metallic structures and the state of the paintings of the Mechanized Arm, Silos and Conveyor Belts of the Plant (2003).

Puerto San Vicente International Terminal

Advice to the ITO on the lining of buried pipes for the project of the Port Fire Network.

Puerto San Vicente International Terminal

Advice to the ITO for the project of galvanizing the metallic structures of a new warehouse of 13.000m².

Sigdo Koppers, Oxygen Plant # 3 of Codelco Chile El Teniente Division

Elaboration of Technical Specifications of Paintings for the Project and the stages of Construction and Assembly.

2002

 Electroandina

Diagnosis and complete assessment of the state of corrosion of the metallic elements and the state of the painting of two cranes located in the dock in Tocopilla.

Puerto San Vicente – International Terminal

Elaboration of technical specifications of paints, advice and inspection for anticorrosive maintenance work and repair of the lower sector of the dock