works carried out from 2002 to date
2017
Zaldivar Mining Company
Study and evaluation of the problems of breakages and corrosion damage of the El Negrillar-Work adduction pipe
Minera Escondida Ltda.
Feasibility study for the implementation of cathodic protection in aqueduct that drives water from Coloso to the Mine.
Minera Escondida Ltda.
Study of mitigation of the external corrosion of the aqueduct that drives water from Coloso to the Mine through the use of inhibitors
Minera Escondida Ltda.
Development of bidding rules for the repair and maintenance of carbon steel silos containers of explosive chemical products in ENAEX plant
Oxiquim S.A.
Fault inspection and assessment at TK 305 at the Quintero maritime terminal.
ASICORP S.A.
Implementation process and certification in ISO 9001: 2015.
ASICORP S.A.
Start of the second phase of the R & D project for the validation and packaging of a joint device for carbon steel pipes that does not damage or burn the internal lining during the welding process, a project developed with the support of CORFO.
Minera Escondida Ltda
Project manager for the inspection and quality assurance work for the anticorrosive maintenance project of the metallic structures and silos of the Enaex Plant in the Mine.
Minera Escondida Ltda.
Fault analysis and study of the problem of ruptures by corrosion of the Coloso-Mina aqueduct. It includes the conceptual study of the solution mechanisms.
2016
Minera Escondida Ltda.
Study of the quality of the internal coatings of the adduction pipes of the EWS project. Corresponds to the evaluation of the water absorption rate of these coatings.
ASICORP S.A.
Development of the first phase of the R & D project for the development of a welded joint capable of avoiding any damage to the internal lining of carbon steel pipes, a project developed with the support of CORFO.
Minera Escondida Ltda.
Study, evaluation of mitigation systems and solution designs to the corrosion problem of the aqueduct that drives water from Coloso to the Mine.
2015
ASICORP S.A.
Development of the first phase of the R & D project for the development of a welded joint capable of avoiding any damage to the internal lining of carbon steel pipes, a project developed with the support of CORFO
Minera Escondida Ltda.
Study, evaluation of mitigation systems and solution designs to the corrosion problem of the aqueduct that drives water from Coloso to the Mine.
Minera Escondida Ltda.
Study and evaluation of the problem of strong incrustation and mechanism of mitigation of these incrustations in the pipeline
Minera Escondida Ltda.
Technical inspection of work and quality assurance to the repair and maintenance work of truck washing slabs.
Minera Escondida Ltda. Elaboration of the bidding technical bases for the maintenance project of the truck washing slabs.
Minera Escondida Ltda.
Technical specifications for repair of concrete floors and metal structure of truck washing slabs.
2014
Minera Spence
Study of the degree and advance of corrosion of the EW Ship based on the analysis of anticorrosive demand. It included metal structure, bridge cranes, concrete floors and structures, FRP structures, pipes, coating plates, fastening systems and bolted joints and ventilation system. According to these results, the technical specifications for each sector and area of the Ship were designed.
Minera Spence
Fault analysis and study of structural collapse by corrosion of the metallic structure of the tertiary harness and secondary crusher
Minera Spence
Technical specification of paint for new metal structure of the tertiary harness and secondary crusher. Inspection in factory to the application of the coating of these equipment.
Minera Spence
Technical specification of paint and maintenance procedure of the metal structure of the agglomerators.
Minera Escondida Ltda.
Continuatión contract finalized in November 2013 and extended until June 2014
Revestimientos Saceem Ltda.
Fault analysis of a duplex system applied to railings directly exposed to the marine environment.
2013
Minera Escondida Ltda.
Contract for 18 months. Corresponds to the full diagnosis of the most critical situations regarding the degree of corrosion and condition of the coatings of the facilities in Puerto Coloso and Mina. As the corrosion problems transcend transversally to other disciplines, the contract considers the anticorrosion protection and engineering designs for the maintenance works, which allow to project the installations for 30 years
2012
Fluor Chile
Evaluation of protection schemes and technical specification of paints for metal structures and concrete coatings, Sierra Gorda Project.
Revestimientos Saceem Ltda.
Fault report to coating of inorganic paint rich in zinc, applied in Electrical Rooms built for Minera Escondida Limitada. The expertise was carried out in dependencies of the supplier company Rolec, Santiago.
Attex Ltda.
Fault analysis of exterior coating of water pipes manufactured and painted in China for the Antucoya project
Barrick Peru
Inspection of the metallic structures painting that will operate in four pools that will contain acid waters and cyanide waters for the Lagunas Norte project in Alto Chicama, Peru. These structures were manufactured in Lima by Maestranza Esmetal. The protection designs were also developed by Asicorp S.A.
2011
Codelco Chile
Study and development of paint specifications for the metallic structure of the engineering projects of the VCP
Outotec Chile Ltda.
Design of paint specifications and antacid coatings for metal structures in the wet area, Caserones project
Outotec Chile Ltda:
Study and design of the antacid coatings specifications for the concrete floors of the wet area, Caserones project
Outotec Chile Ltda.
Design and evaluation of the interior protective lining of thickener for Mina Hales project.
Fluor Chile
Evaluation of the infrastructure and operational capacity of painting of the Esmetal factory in Lima, Peru, Pila Nueva project with CIC.
ERCO Worldwide
Study and design of the condition of concrete floors and protective coatings for Mininco Plant.
ERCO Worldwide
Study of the corrosion state and design of the protective coatings for structure and metallic elements in Mininco Plant
Anglo American
Study of the corrosion state and design of the protective coatings for structure and metallic elements of the El Soldado Division Building.
Suez Andean Projects:
Paint failure evaluation in water storage tanks at the Andina Thermoelectric Plant in Mejillones
GHD Engineers:
Advice to the designs of anticorrosive protection of piles and metal structure for the project “Repair Dársena, Molo Chacabuco and Molo Prat of the Asmar Talcahuano Plant, Repair of Molo 500 and Construction South Molo of the Chileans Navy ”
Fluor Chile:
Evaluation of protection schemes and technical specification of paints for metal structures and coatings for concrete, NaHS Plant and Mineral PAG, Conga Project
Outotec Chile Ltda.
Design of paint specifications and antacid coatings for metal structures and concrete floors in the wet area, Caserones project (2011).
2010
Codelco Chile:
Study and development of the technical specifications of painting for the metallic structures of engineering projects of the VCP
Delkor Chile
Evaluation of coatings systems for thickeners of the Pascua Lama project
Fluor Chile
Study, evaluation and design of the anticorrosive systems of metallic structures and concrete foundations of the facilities of the ponds for the Pila Nueva Project with CIC in Alto Chicama, Peru (2010).
Minera Zaldivar S.A.
Evaluation, diagnosis and design of antacid systems for the repair of concrete floors and pillars cell supports of EW Building
Hatch Ingenieros y Consultores Ltda:
Study, design and elaboration of the technical specifications of interior corrosion protection of ponds for chemical treatment plant belonging to Compañía Minera Doña Inés de Collahuasi.
Petrohué River Building, Viña del Mar:
Study and design of repair of blown stuccos that presented detachment, with high risk to people. The project report considered the total removal of the stucco, the repair of damaged concretes, waterproofing of the planters and balconies, placement of an adequate coating. The volume of stucco to be removed is 83 m3
2009
Fluor Chile:
Study and development of technical specification of paint for metal structures and exterior of ponds Pascua Lama of Barrick project.